The Marquess 5th 15th and 18th Fairway Drainage

Overview

In March we installed secondary fairway drainage on the 3rd and 5th holes on The Marquess course. Following the success of the project we returned in August to install further drainage on the 5th, 15th and 18th. A Shelton System 25™ machine was used which excavates a narrow 25mm trench and backfills in a single operation. The narrow trenches are left flush to the playing surface. The Shelton delivers a tidy finish ensuring the hole is instantly back in play. Read more about the Shelton System 25™ in March's fairway drainage project .

Photography

On site at Woburn Golf Club.

3 photographs · August 2016