Overview
In 2016 we began renovating the Cantour Down at Warwick Racecourse and in July 2018 we returned to complete the project.
Photography
On site at Warwick Racecourse.
13 photographs · July 2018
We scraped away the rotting wood chip surface down to clean stone. Additional stone was imported, as required, to ensure a level formation. A v-shaped trench was cut into the centre of the walkway and drainage pipe installed. The surface was finished with a 150mm layer of fibre sand.
We excavated a soakaway, installed attenuation cells and connected the drain. The soakaway was backfilled with gravel.