Poult Wood Golf Course

Golf Course Construction · March 2015

Poult Wood Golf Course

18th Bunker Construction and Pathways

Overview

The existing turf was stripped from the bunker surrounds including areas that had been sand splashed. Fineturf supplied 60 tons of topsoil which was used to shape the new bunker. A trench was excavated in the base and an 80mm drainage pipe installed and connected to an existing drain. Final ground preparation was completed by hand and the bunkers surrounds turfed. Fineturf also supplied the new sand.

Photography

On site at Poult Wood Golf Course.

4 photographs · March 2015

Enquire

Discuss a similar golf course construction project.