In August we worked at the Nottingham Tennis Court to replace a selection of their tennis net sockets. The existing turf was carefully stripped to be relaid upon completion of the works. The old concrete was jack hammered and removed. Concrete was mixed and poured to 100mm below the final surface. Topsoil was added, raked level and the old turf replaced.