Overview
In August we renovated King's College School cricket square. The existing surface was removed cultivated and laser levelled. Loam was spread and levelled in layers then keyed in with a Graden. Final preparations before seed and fertiliser were carried out with a pedestrian rotor rake and hand rakes. The fertiliser was spread and Limagrain MM50 cricket-wicket grass seed sown before being hand raked in.
Photography
On site at Kings College School.
17 photographs · August 2021
Enquire


