Huntingdon Racecourse

Racecourses · June 2018

Huntingdon Racecourse

Sand Slit Installation

Overview

During this visit to Huntingdon we installed 6,496lm of sand slits at 1m centres. The sand slits were 50mm wide x 500mm deep and backfilled to within 200mm of the surface using clean drainage gravel and topped up with rootzone which was then consolidated. The drainage runs were then seeded.

Photography

5 photographs · June 2018

Enquire

Discuss a similar racecourses project.