Huntingdon Racecourse

Racecourses · June 2018

Huntingdon Racecourse

Sand Slit Installation

Overview

During this visit to Huntingdon we installed 6,496lm of sand slits at 1m centres. The sand slits were 50mm wide x 500mm deep and backfilled to within 200mm of the surface using clean drainage gravel and topped up with rootzone which was then consolidated. The drainage runs were then seeded.

Photography

On site at Huntingdon Racecourse.

5 photographs · June 2018

Enquire

Discuss a similar racecourses project.