Hockley Golf Club

Golf Course Construction · February 2013

Hockley Golf Club

Tee Construction

Overview

We have just completed the reconstruction of the 5th and 12th tees at Hockley Golf Club, Winchester. The course, established in 1914, is set in 250 acres of free draining chalk downland. The greenkeeping staff hope the members will be enjoying the new tees by early April.

In summary the scope of works included:

Photography

On site at Hockley Golf Club.

3 photographs · February 2013

Strip off existing turf

Laser grade the existing material

Cut V-shaped drainage trenches into the formation using our Volvo Excavator

Install 80mm perforated drainage pipe and backfill trenches

Install a 100mm layer of 10mm drainage gravel

Install a 25mm blinding grit layer

Spread a 200mm layer of rootzone, an 80/20 mixture

Precision laser grade the rootzone

Carry out final ground preparation work

Install large roll tees turf, supplied by Tillers Turf

Glenn Kirby, head greenkeeper, has prepared two excellent articles discussing the construction techniques used. These can be read at his greenkeeping blog:

http://hockleygc.blogspot.co.uk/2013/02/tee-reconstruction.html

http://hockleygc.blogspot.co.uk/2013/02/turfing-new-tees.html

Enquire

Discuss a similar golf course construction project.