Overview
Over the last year operatives from the Fineturf team have been working hard at a large country estate in Hampshire. The soft and hard landscaping project included:
35,000m2 topsoil strip, cut and fill, reshaping, landscaping and preparation.
Photography
On site at Country Estate.
59 photographs · March 2016
Installation of Tillers Arena Gold.
Irrigation system on all grounds.
6000T topsoil importation.
Lagoon and oak sleeper waterfall construction in forest.
Sump and sewage pump installation.
Installation of Tillers Wildflower Turf.
1.5km tarmac driveway construction and kerbing.
Artificial turf installation to driveway verges.