Belton Woods Golf Club and Hotel

Golf Course Construction · November 2013

Belton Woods Golf Club and Hotel

Golf Course Ditch Installation

Overview

We have recently installed a new drainage ditch at De Vere Belton Woods that runs through holes on both the Lakes and Woodside golf courses. A bespoke ditching bucket was used to excavate the material and laser guided equipment ensured the correct falls. These allowed water to run in two directions, into a lake and an existing open ditch on the edge of the course. During excavation existing land drainage was connected. A number of fairway crossings were also encountered for which drainage pipe was installed and the area backfilled with topsoil and returfed.

Photography

On site at Belton Woods Golf Club and Hotel.

17 photographs · November 2013