Soft Landscaping · March 2022

Battersea Power Station

Turf Installation

Overview

As part of the highly anticipated redevelopment of the iconic Battersea Power Station, Fineturf were contracted to turf several areas across the site to ensure the best possible quality. We started with removing the existing turf and regrading the rootzone to ensure the correct levels. The fertiliser was spread and Tillers Turf Arena Gold Shortcut was installed and rolled.

Photography

On site at Battersea Power Station.

17 photographs · March 2022

Enquire

Discuss a similar soft landscaping project.