In September we visited Barnack Cricket Club to reconstruct their 25m x 25m square, reducing the number of pitches from ten to eight. The existing surface was removed using a Koro fraise mow. The square was cultivated and the remaining loam removed and stockpiled on site for reuse later.
Photography
On site at Barnack Cricket Club.
15 photographs · September 2018
The new square was marked out and the levels set. The formation was laser graded and previously stored loam spread as a base layer for the new square and laser graded. Ongar loam was supplied, spread, consolidated and laser levelled in layers to complete the construction.
6:5:18 fertiliser was applied and MM50 grass seed sown.